Reroofing a Seventies Split-Entry Down to the Wood
Taylorsville is full of split-entry houses from the seventies and eighties, and a lot of them are well past their first roof by now. From the street the roof looks like an easy one: two plain slopes, a ridge, sometimes a chimney. What decides how the job goes is under the shingles, and you only find that out once they come off.
Whatever was done on the earlier reroof shows up in the decking, in the flashings and in the way an addition was tied in, and a good replacement deals with all of it before a single new shingle goes down.
This is how I approach a replacement on one of these houses, start to finish. For the rest of what we do around town, the Taylorsville page has it.
Essentials
- Every replacement goes down to bare wood before anything new goes on.
- The decking gets checked board by board once the old layers are off.
- Additions often meet the main roof at an improvised valley.
- Repair is the recommendation whenever repair is the honest call.
- Most replacements take one to three days.
What Decades of Valley Weather Do to a Split-Entry Roof
A split-entry roof is usually low and simple, which helps it in some ways and hurts it in others. Summer sun at this altitude bakes the shingles until the granules let go and the mat underneath turns brittle. Winter adds snow load and the freeze-thaw cycle, which works water into any crack and opens it a little wider each night. Out on this side of the valley, west wind across open blocks gets under any tab that has lost its seal.
The fastener pattern matters too. Houses from that era were nailed to the standard of their day, and a reroof done later may have been nailed to no real standard at all. When I find nails shot high on the shingle, or too few per piece, I know the whole field has been holding on with less than it should.
None of this means your roof is finished. It means a roof that age has taken a long run of weather, and the questions worth asking are about the deck under it and the details around it.
Down to Bare Wood, Board by Board
On a Taylorsville reroof, every old layer comes off before anything new goes down. Laying new shingles over old ones saves a day and hides the one thing you most need to see, which is the decking. With the old layers off, we walk the deck and check it board by board.
On a split-entry the soft spots tend to turn up in predictable places: along the eaves, where ice and water sit longest, around a chimney or a pipe that leaked slowly for years, and at the edges of any earlier patch. A soft board gets cut out and replaced before anything goes on top of it. Nailing a new roof to rotten wood is how a young roof ends up with a dip in it.
Once the deck is sound, synthetic underlayment goes down, then the shingles. We install IKO shingles, and I photograph the deck and the underlayment before they get covered, because that is the part of the job you will never see again. If you want to see what finished work looks like, the gallery is all our own.

Where an Addition Meets the Original Roof
Plenty of split-entries in town have grown since they were built. A family room off the back, a garage pushed out, a patio roofed in later. Where that newer roof meets the old one there is often an improvised valley, cut in by whoever framed the addition, with flashing bent to fit on the spot.
Those valleys collect snowmelt and leaves, and they are where I find the most leaks on houses like these. On a replacement, the valley gets torn out with everything else and rebuilt properly, lined and flashed so it carries water down and off the roof instead of letting it sit at a seam.
Ventilation is the other weak detail of that era. Attic venting was often an afterthought when these houses went up, and an addition can block what little airflow the original roof had. A roof that cannot breathe cooks its shingles from underneath in summer and grows frost on the underside of the deck in winter. While the roof is open, I check the intake and the exhaust and fix what is missing, so the new shingles are not fighting the attic for their whole life.
Repair First, When Repair Is the Honest Answer
A lot of the calls I take end with me recommending a repair. A roof with a few bad spots does not need to come off just because a full replacement is the bigger job for the contractor. If your roof has years left and one failed pipe boot or a handful of lifted shingles, I will tell you that and fix that.
The signs that point toward replacement are usually spread across the whole roof instead of gathered in one place. Granules washing out of every downspout. Shingles curling or cracking on both slopes. Decking that feels soft underfoot in more than one spot. A roof that has been patched three or four times already and keeps finding new places to leak.
I take pictures as I go and show them to you, so you can see what I saw instead of taking my word for it. Some homeowners decide to repair now and plan a replacement in a few years, and that can be a sound plan. We are not the biggest roofer around, and the reason people call us back is that the advice was straight the first time.
Booking a Replacement Around the Winter
Snow usually just moves the calendar. If your roof needs replacing and it is January, I can do the assessment now and book the install for a warm window, with the firm number already in writing. You are not left guessing what the job will cost or whether the number will drift by spring.
An active leak gets handled now, not in spring. If water is already getting in, we dry it in first so nothing gets worse while you wait, and the full replacement follows when the weather allows. Once we start, most replacements take one to three days.

The finish counts as much as the shingles. When the last course is on, a magnet sweep goes through the lawn, the gutters get cleared, the haul-off gets scheduled and the warranty paperwork goes in your hand. The roof replacement we do in Taylorsville follows that same order on every house, and the main roof replacement page covers materials and process. If the old roof also lost tabs in a windstorm, the wind damage page explains how that side gets handled. Book an assessment and I will walk the whole roof with you.
Questions About Reroofing a Split-Entry
What does a tear-off turn up on a split-entry?
Usually a deck with some history. Soft boards along the eaves where ice sat the longest, rot around a chimney or pipe that leaked slowly for years, and the edges of old patches nobody wrote down. Sometimes nails shot high or too few per shingle. Every soft board gets cut out and replaced, and I photograph the deck before anything covers it again.
Why does an addition valley leak?
Because whoever framed the addition often cut the valley in on the spot and bent the flashing to fit. That seam collects snowmelt and leaves, and water sits there instead of running off. On a replacement I tear the valley out with everything else and rebuild it lined and flashed, so it carries water down to the gutter. Patching the old seam only buys time.
Will a new roof fix ice at my eaves?
Not by itself. Ice at the eave usually starts in the attic, where warm air melts the snow on the roof and the water refreezes at the cold edge. New shingles do not change that. While the roof is open I check the intake at the soffit and the exhaust up high, and fixing the venting is what does most of the work against ice.
Split-Entry Roof Looking Tired? Have Jeremy Look at It.
I get on the roof, photograph the deck edges, the valleys and the flashings, and tell you straight whether it needs a repair or a replacement. You get a firm number in writing, and the visit costs nothing.
Call (801) 750-4243or book a free roof assessmentWant proof first? The gallery is all our own work.